Strategic memorandum • Deployment
Madhya Pradesh–Submer AI capacity program
The Government of Madhya Pradesh and Submer signed a memorandum of understanding covering up to 1 GW of liquid-cooled data center capacity.
Direct answer
What this record says
Madhya Pradesh–Submer AI capacity program is a planned cooling deployment in Madhya Pradesh, India, operated by Government of Madhya Pradesh and Submer. It is recorded at Up to 1 GW under a memorandum of understanding. It was announced July 28, 2025. Last reviewed Aug. 9, 2026 against 1 source.
- Operator
- Government of Madhya Pradesh and Submer
- Stage
- Planned
- Capacity
- Up to 1 GW under a memorandum of understanding
- Rack density
- Not disclosed
Project brief
What is publicly known
Status: planned, with a low evidence threshold because the underlying document is a memorandum of understanding. In July 2025, the Government of Madhya Pradesh and Submer said they would work toward as much as one gigawatt of liquid-cooled, artificial-intelligence-ready data center capacity. They also named design standards, local supply chains, and workforce development as parts of the collaboration.
The release supports the existence of the memorandum and the scope the parties want to explore. It does not show that a site, investor, utility, tenant, or construction contract exists. The cooling relevance is real but remains conceptual.
The parties mention immersion, direct-to-chip, and hybrid cooling, and they claim the future facilities would consume no water. Those architectures have different facility, hardware, and service requirements, so naming all three does not yet define a buildable design. Madhya Pradesh also spans hot seasonal conditions.
A no-water design would need dry or hybrid heat rejection sized for the hottest hours, plus a clear power penalty. Neither duty points nor design sites are public. The largest unknown is what the one-gigawatt figure means.
It may be a ceiling across many future projects rather than committed information-technology load. No capacity is financed, permitted, ordered, or under construction in the cited source. There are no named locations, phases, grid connections, customers, budgets, or dates.
Evidence that would change the status includes a named parcel, state approval, power allocation, environmental filing, financing close, anchor customer, engineering contract, or cooling-equipment order tied to a specific phase. Ground works and construction reporting would justify deploying. Commissioned capacity with an identified operator would justify operating.
Until then, the number should never be counted as built or near-term supply.
Status is labeled from public evidence. Supplier orders, MoUs, pilots, projects under delivery, and operating sites are not counted as equivalent.
- Status
- Planned
- Operator
- Government of Madhya Pradesh and Submer
- Location
- Madhya Pradesh, India
- Capacity
- Up to 1 GW under a memorandum of understanding
- Rack density
- Not disclosed
- Compute
- AI-ready data centers
- Announced
- Jul 28, 2025
Connected records
Companies involved
Connected records
Cooling architecture
Direct-to-chip liquid cooling
A metal plate sits directly on each processor, and liquid pumped through it carries the heat out of the rack.
Single-phase immersion cooling
Whole servers sit in a tank of oil-like fluid that does not conduct electricity. The fluid warms up and carries the heat away without ever boiling.
Hybrid air and liquid cooling
Liquid takes the heat off the processors while air handles the rest of the rack. Almost every liquid-cooled hall works this way.
Connected records
Equipment chain
Coolant distribution units
The unit that stands between the building's water and the servers, controlling how much coolant flows, how cold it is, and how clean it stays.
Immersion cooling tanks
The tank itself, plus everything needed to run submerged servers: power, networking, lifting gear, and fluid handling.
Evidence ledger
Sources and evidence
The links below show where the factual claims came from. Supplier specifications remain supplier-reported unless the record names independent operating evidence.
- 01Government of Madhya Pradesh signs strategic MoU with Submer
Submer · Jul 28, 2025
Record information
- Record ID
- DCC / DEPL / MADHYA-PRADE
- Record reviewed
- Aug. 9, 2026
- Newest source published
- July 28, 2025
- Record first published
- Aug. 9, 2026
- External sources
- 1
- Search visibility
- Offered to search engines
This field was researched and is not published by the party who would know:
- Rack density
Decide between
Comparable deployments
Records covering the same cooling architecture, most-evidenced first.
Add two or more, then open the comparison to see every stated claim, its duty point, and its source side by side.
Latest coverage