Loading deployments…
Loading deployments…
Project database
Check what is operating, deploying, piloting, or merely planned, and see the public evidence that supports each status.
Use this section to decide
Is this system operating, being installed, piloting, or only announced?
What capacity, rack density, compute, and cooling architecture are public?
What evidence would be needed before treating the project as proven?
Featured records first, then the section's own editorial order.
An unnamed Illinois data center installed Veolia pH control, acid feed, remote monitoring, and alarms for its cooling-tower water.
Supplier reported9 of 9 required fields addressedReviewed Oct. 4, 2026
Supplier reported9 of 9 required fields addressedReviewed Oct. 4, 2026
An unnamed 160 MW high-performance-computing customer adopted a chillerless BAC HXV hybrid-cooler design.
Supplier reported8 of 9 required fields addressedReviewed Oct. 4, 2026
Infosys uses multiple SWEP B649 heat exchangers to isolate cooling-tower water from the clean data-center cooling loop in Hyderabad.
Supplier reported9 of 9 required fields addressedReviewed Oct. 4, 2026
NREL's Energy Systems Integration Facility uses Bell & Gossett pumps in a warm-water supercomputing loop that captures heat for building reuse.
Operating evidence9 of 9 required fields addressedReviewed Oct. 4, 2026