Planned deployment Deployment

DarkNX Ontario AI campus

DarkNX agreed to deploy Accelsius NeuCool across a planned 300 MW AI data-center campus in Ontario.

Ontario300 MWNeuCooltwo phase

Direct answer

What this record says

DarkNX Ontario AI campus is a planned cooling deployment in Ontario, Canada, operated by DarkNX. It is recorded at 300 MW planned; first phase two × 65 MW. It was announced Nov. 17, 2025. Last reviewed Aug. 9, 2026 against 1 source.

1 sourceReviewed Aug. 9, 2026
Operator
DarkNX
Stage
Planned
Capacity
300 MW planned; first phase two × 65 MW
Rack density
Not disclosed

Project brief

What is publicly known

Status: planned. The evidence is a November 2025 Accelsius release saying DarkNX entered an agreement to use NeuCool across a proposed 300 megawatt campus in Ontario. It describes two 65 megawatt facilities in the first phase, with deployments scheduled for 2026 and 2027.

That is evidence of a supplier selection and a stated program, not evidence that construction or equipment delivery has begun. No operator, utility, regulator, or local planning source is included in the public record. What is known is the intended thermal chain.

Accelsius would capture chip heat with a dielectric fluid that boils inside a two-phase direct-to-chip loop. Johnson Controls chillers would serve the facility side. Accelsius says the design can accept warmer facility water, which could increase the hours when outdoor conditions help reject heat and reduce compressor work.

The actual result will depend on the Ontario site, server configuration, water temperatures, redundancy, and how much rack heat remains on air. Unknowns include the site address, land control, financing, permits, utility interconnection, construction contractor, compute vendor, rack density, equipment quantities, and the schedule beyond the first two buildings. The release also gives no signed contract value or delivery milestones.

These omissions prevent a view on cost or delivery confidence. We would move the record to deploying after independent evidence of site work, permits, financing, utility capacity, or delivered cooling equipment. Commissioning records, operator confirmation, or measured operation would support an operating status.

A missed 2026 milestone, cancelled agreement, or loss of site control would instead weaken or close the record.

Status is labeled from public evidence. Supplier orders, MoUs, pilots, projects under delivery, and operating sites are not counted as equivalent.

Status
Planned
Operator
DarkNX
Location
Ontario, Canada
Capacity
300 MW planned; first phase two × 65 MW
Rack density
Not disclosed
Compute
AI and high-density GPU workloads
Announced
Nov 17, 2025

Connected records

Companies involved

Connected records

Cooling architecture

Connected records

Equipment chain

Evidence ledger

Sources and evidence

The links below show where the factual claims came from. Supplier specifications remain supplier-reported unless the record names independent operating evidence.

  1. 01
Record information
Record ID
DCC / DEPL / DARKNX-ONTAR
Record reviewed
Aug. 9, 2026
Newest source published
Nov. 17, 2025
Record first published
Aug. 9, 2026
External sources
1
Search visibility
Offered to search engines

This field was researched and is not published by the party who would know:

  • Rack density

Decide between

Comparable deployments

Records covering the same cooling architecture, most-evidenced first.

View all deployments

Add two or more, then open the comparison to see every stated claim, its duty point, and its source side by side.

Latest coverage

Intelligence mentioning DarkNX Ontario AI campus

View all intelligence mentioning darknx ontario ai campus