Proof of concept Deployment

Stellium OCP immersion proof of concept

Stellium Data Centres, Circle B, and Submer assembled an OCP-aligned immersion-cooling proof of concept.

OCPStelliumSubmerimmersion

Direct answer

What this record says

Stellium OCP immersion proof of concept is a pilot cooling deployment in Newcastle, United Kingdom, operated by Stellium Data Centres. It is recorded at Proof of concept. It was announced April 1, 2025. Last reviewed Aug. 9, 2026 against 1 source.

1 sourceReviewed Aug. 9, 2026
Operator
Stellium Data Centres
Stage
Pilot
Capacity
Proof of concept
Rack density
Not disclosed

Project brief

What is publicly known

Status: pilot. The April 2025 announcement says Stellium Data Centres, Circle B, and Submer assembled an immersion-cooling proof of concept at Stellium's Newcastle site. The design combines Submer equipment, Circle B integration, MiTAC Open Rack version 3 servers, AMD processors, and an ExxonMobil dielectric fluid.

That bill of materials is useful because it identifies the interfaces a buyer would need to qualify. It also aligns the server format with work from the Open Compute Project, rather than presenting the tank as an isolated appliance. The source is a Submer partner release, and the linked page is no longer available at its recorded address.

The surviving record does not include a separate Stellium report, test method, capacity, commissioning date, or measured result. Cooling relevance comes from interoperability. Single-phase immersion keeps the coolant liquid while it carries heat from the servers to a heat exchanger.

The pilot can test whether server materials, cabling, fluid, tank, controls, and service procedures work together. It cannot by itself prove long-term fluid compatibility, production availability, or whole-facility energy savings. Unknowns include tank model and count, rack-equivalent density, coolant temperature, facility-water design, workload, duration, partial power usage effectiveness, fluid sampling, server warranty, and whether technicians performed live maintenance exercises.

The proof of concept should remain a pilot until the partners publish acceptance criteria and results. Repeat operation under sustained load, an operator case study, or a decision to convert the installation to production would strengthen the record. A commercial expansion with named capacity could justify deploying or operating status for that phase.

If the equipment was only assembled for a temporary demonstration and has since been removed, the current label would overstate persistence; dated operator confirmation would resolve that gap.

Status is labeled from public evidence. Supplier orders, MoUs, pilots, projects under delivery, and operating sites are not counted as equivalent.

Status
Pilot
Operator
Stellium Data Centres
Location
Newcastle, United Kingdom
Capacity
Proof of concept
Rack density
Not disclosed
Compute
Mitac Open Rack v3 servers with AMD CPUs
Announced
Apr 1, 2025

Connected records

Companies involved

Connected records

Cooling architecture

Connected records

Equipment chain

Evidence ledger

Sources and evidence

The links below show where the factual claims came from. Supplier specifications remain supplier-reported unless the record names independent operating evidence.

  1. 01
Record information
Record ID
DCC / DEPL / STELLIUM-OCP
Record reviewed
Aug. 9, 2026
Newest source published
April 1, 2025
Record first published
Aug. 9, 2026
External sources
1
Search visibility
Offered to search engines

This field was researched and is not published by the party who would know:

  • Rack density

Decide between

Comparable deployments

Records covering the same cooling architecture, most-evidenced first.

View all deployments

Add two or more, then open the comparison to see every stated claim, its duty point, and its source side by side.