Loading deployments…
Loading deployments…
Project database
Check what is operating, deploying, piloting, or merely planned, and see the public evidence that supports each status.
Use this section to decide
Is this system operating, being installed, piloting, or only announced?
What capacity, rack density, compute, and cooling architecture are public?
What evidence would be needed before treating the project as proven?
Featured records first, then the section's own editorial order.
| Record | Stage | Operator | Location | Architecture | Suppliers | Capacity | Rack density | Compute | Announced | Fields addressed | Evidence | Sources | Reviewed | Comparison |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Valvoline–Iceotope 18-month fluid validation | Pilot | Valvoline Global Operations and Iceotope | Location not disclosed | Precision Liquid Cooling, Single Phase Immersion | 3 | 5.2 kW reported test load | Not disclosed; test was not reported as a full rack | HPE DL380 servers with NVIDIA A40 GPUs | 2025-12-01 | 9/9 | Supplier reported | 1 |