Loading deployments…
Loading deployments…
Project database
Check what is operating, deploying, piloting, or merely planned, and see the public evidence that supports each status.
Use this section to decide
Is this system operating, being installed, piloting, or only announced?
What capacity, rack density, compute, and cooling architecture are public?
What evidence would be needed before treating the project as proven?
Featured records first, then the section's own editorial order.
| Record | Stage | Operator | Location | Architecture | Suppliers | Capacity | Rack density | Compute | Announced | Fields addressed | Evidence | Sources | Reviewed | Comparison |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Illinois data-center cooling-water treatment retrofit | Operating | Undisclosed data-center operator | Illinois, United States; city not disclosed | Evaporative Cooling, Hybrid Cooling | 1 | Not disclosed | Not disclosed | Not disclosed | 2025-07-23 | 9/9 | Supplier reported | 1 |
| Novva Colorado Springs cooling-controls retrofit | Operating | Novva Data Centers | Colorado Springs, Colorado, United States | Hybrid Cooling | 1 | Four chillers and two chiller plants; IT capacity not disclosed | Not disclosed | Colocation workloads; server platform not disclosed | 2024-07-22 | 9/9 | Supplier reported | 2 |
|---|
| DataBank ATL1 ColdLogik rear-door cooling | Operating | DataBank | Atlanta, Georgia, United States | Rear Door Heat Exchangers, Hybrid Cooling | 1 | ATL1 facility: 7.1 MW current critical IT load; ColdLogik subsystem capacity not publicly disclosed | 50 kW per rack at 73°F water reported for the ColdLogik design | Georgia Tech high-performance computing and research workloads | 2019-11-28 | 9/9 | Supplier reported | 2 |
|---|