Project database
Check what is operating, deploying, piloting, or merely planned, and see the public evidence that supports each status.
Use this section to decide
Is this system operating, being installed, piloting, or only announced?
What capacity, rack density, compute, and cooling architecture are public?
What evidence would be needed before treating the project as proven?
Featured records first, then the section's own editorial order.
| Record | Stage | Operator | Location | Architecture | Suppliers | Capacity | Rack density | Compute | Announced | Fields addressed | Evidence | Sources | Reviewed | Comparison |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Güntner Zhangjiakou immersion-cooling heat rejection | Operating | Not publicly disclosed; described as a major Chinese e-commerce company | Zhangjiakou, Hebei, China | Two Phase Immersion, Dry Cooling +1 | 1 | 1,060 kW aggregate dry-cooler capacity | Not publicly disclosed | Cloud computing in two-phase immersion; hardware not publicly disclosed | 2017-01-01 | 9/9 | Supplier reported | 1 |
| NREL ESIF warm-water cooling loop | Operating | National Renewable Energy Laboratory | Golden, Colorado, United States | Direct To Chip, Heat Reuse +1 | 2 | IT capacity not disclosed in the cited Xylem case | Not disclosed | Warm-water liquid-cooled high-performance computing systems | 2012-01-01 | 9/9 | Operating evidence | 2 |
|---|