Loading deployments…
Loading deployments…
Project database
Check what is operating, deploying, piloting, or merely planned, and see the public evidence that supports each status.
Use this section to decide
Is this system operating, being installed, piloting, or only announced?
What capacity, rack density, compute, and cooling architecture are public?
What evidence would be needed before treating the project as proven?
Featured records first, then the section's own editorial order.
An unnamed 160 MW high-performance-computing customer adopted a chillerless BAC HXV hybrid-cooler design.
Supplier reported8 of 9 required fields addressedReviewed Oct. 4, 2026
DataBank's ATL1 facility uses ColdLogik rear-door cooling for Georgia Tech high-performance computing loads in Atlanta.
Supplier reported9 of 9 required fields addressedReviewed Oct. 4, 2026
Four Güntner V-shape VARIO dry coolers reject heat from a two-phase immersion data center in Zhangjiakou, China.
Supplier reported9 of 9 required fields addressedReviewed Oct. 4, 2026
Infosys uses multiple SWEP B649 heat exchangers to isolate cooling-tower water from the clean data-center cooling loop in Hyderabad.
Supplier reported9 of 9 required fields addressedReviewed Oct. 4, 2026
The University of Cambridge uses ColdLogik rear-door heat exchangers in its West Cambridge Data Centre for high-density research computing.
Supplier reported9 of 9 required fields addressedReviewed Oct. 4, 2026
NREL's Energy Systems Integration Facility uses Bell & Gossett pumps in a warm-water supercomputing loop that captures heat for building reuse.
Operating evidence9 of 9 required fields addressedReviewed Oct. 4, 2026