Project database
Check what is operating, deploying, piloting, or merely planned, and see the public evidence that supports each status.
Use this section to decide
Is this system operating, being installed, piloting, or only announced?
What capacity, rack density, compute, and cooling architecture are public?
What evidence would be needed before treating the project as proven?
Featured records first, then the section's own editorial order.
| Record | Stage | Operator | Location | Architecture | Suppliers | Capacity | Rack density | Compute | Announced | Fields addressed | Evidence | Sources | Reviewed | Comparison |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| DataBank ATL1 ColdLogik rear-door cooling | Operating | DataBank | Atlanta, Georgia, United States | Rear Door Heat Exchangers, Hybrid Cooling | 1 | ATL1 facility: 7.1 MW current critical IT load; ColdLogik subsystem capacity not publicly disclosed | 50 kW per rack at 73°F water reported for the ColdLogik design | Georgia Tech high-performance computing and research workloads | 2019-11-28 | 9/9 | Supplier reported | 2 |
| West Cambridge Data Centre ColdLogik cooling | Operating | University of Cambridge | Cambridge, England, United Kingdom | Rear Door Heat Exchangers, Hybrid Cooling | 1 | 1.2 MW data-hall capacity reported by USystems | Up to 44 kW per cabinet reported by USystems | University research computing and administrative services | 2015-03-19 | 9/9 | Supplier reported | 2 |
|---|