Loading deployments…
Loading deployments…
Project database
Check what is operating, deploying, piloting, or merely planned, and see the public evidence that supports each status.
Use this section to decide
Is this system operating, being installed, piloting, or only announced?
What capacity, rack density, compute, and cooling architecture are public?
What evidence would be needed before treating the project as proven?
Featured records first, then the section's own editorial order.
| Record | Stage | Operator | Location | Architecture | Suppliers | Capacity | Rack density | Compute | Announced | Fields addressed | Evidence | Sources | Reviewed | Comparison |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| NorthC Eindhoven MIXIT chip-cooling loop | Operating | NorthC Datacenters | Eindhoven, North Brabant, Netherlands | Direct To Chip, Heat Reuse +1 | 1 | Not publicly disclosed | Not publicly disclosed | High-performance computing and chip-level liquid-cooled workloads | 2022-06-01 | 9/9 | Supplier reported | 2 |
| Fugaku Stäubli CGD cooling connections | Operating | RIKEN | Kobe, Hyogo, Japan | Direct To Chip | 1 | 400 racks; compute power capacity not stated in cited cooling source | Not publicly disclosed | Fujitsu Fugaku supercomputer with more than 150,000 processors reported by Stäubli | 2021-03-09 | 9/9 | Supplier reported | 2 |
|---|
| NREL ESIF warm-water cooling loop | Operating | National Renewable Energy Laboratory | Golden, Colorado, United States | Direct To Chip, Heat Reuse +1 | 2 | IT capacity not disclosed in the cited Xylem case | Not disclosed | Warm-water liquid-cooled high-performance computing systems | 2012-01-01 | 9/9 | Operating evidence | 2 |
|---|