Loading equipment…
Loading equipment…
Equipment taxonomy
Understand every interface between the chip and the heat-rejection plant, including failure risks and the questions that separate credible bids.
Use this section to decide
What job does this component perform in the complete thermal chain?
Which interfaces, controls, and failure modes determine whether it works?
What must every supplier state in a comparable proposal?
Featured records first, then the section's own editorial order.
The unit that stands between the building's water and the servers, controlling how much coolant flows, how cold it is, and how clean it stays.
Independently reported5 of 5 required fields addressedReviewed Aug. 9, 2026
A water-cooled coil built into the back door of a rack, cooling the hot air as it leaves.
Independently reported5 of 5 required fields addressedReviewed Aug. 9, 2026
Project sourcing
Tell us the capacity, location, and timing once. We'll reply within one working day with suppliers that fit — free for buyers.
Get a supplier shortlistIndependently reported4 of 5 required fields addressedReviewed Aug. 9, 2026
Towers that cool water by letting some of it evaporate, which works better than air alone but consumes water.
Independently reported4 of 5 required fields addressedReviewed Aug. 9, 2026
The fans and coils that cool the room's air. Even liquid-cooled halls still need them.
Independently reported4 of 5 required fields addressedReviewed Aug. 9, 2026
Refrigeration equipment that makes cold water on demand, whatever the weather outside is doing.
Independently reported4 of 5 required fields addressedReviewed Aug. 9, 2026
The pipework inside a rack that splits coolant from one supply line out to every server, and collects it again.
Independently reported4 of 5 required fields addressedReviewed Aug. 9, 2026