Project database
Check what is operating, deploying, piloting, or merely planned, and see the public evidence that supports each status.
Use this section to decide
Is this system operating, being installed, piloting, or only announced?
What capacity, rack density, compute, and cooling architecture are public?
What evidence would be needed before treating the project as proven?
Featured records first, then the section's own editorial order.
DarkNX agreed to deploy Accelsius NeuCool across a planned 300 MW AI data-center campus in Ontario.
Supplier reported9 of 9 required fields addressedReviewed Aug. 9, 2026
Accelsius deployed its NeuCool IR80 two-phase direct-to-chip system at Equinix's DC15 Co-Innovation Facility in Ashburn.
Supplier reported9 of 9 required fields addressedReviewed Aug. 9, 2026
SoftBank, ZutaCore, and Foxconn demonstrated a rack-integrated two-phase direct-to-chip system using NVIDIA H200 GPUs.
Supplier reported9 of 9 required fields addressedReviewed Aug. 9, 2026
NorthC operates a Grundfos MIXIT-controlled water loop for chip-level cooling at its High Tech Campus Eindhoven data center.
Supplier reported9 of 9 required fields addressedReviewed Oct. 4, 2026
Fujitsu integrated Stäubli CGD quick-release couplings into Fugaku's liquid-cooled blade system at RIKEN in Kobe.
Supplier reported9 of 9 required fields addressedReviewed Oct. 4, 2026