Regional cooling market • Market
Texas data center cooling market
Growing fast, with an unusual concentration of cooling companies based in the state, very hot summers, and several immersion projects to look at.
Direct answer
What this record says
Texas data center cooling market is a data-center market this database tracks cooling activity in. It covers 2 recorded deployments. Last reviewed Aug. 9, 2026 against 3 sources.
- Country
- United States
- Region
- Texas
- Deployments
- 2 deployments
Market brief
Why cooling is different here
Texas combines a large project pipeline with a real cooling supply base. LiquidStack operates from Carrollton, while GRC, Accelsius, and Midas are associated with the Austin market. Dell and HPE add server and integration depth.
That cluster can shorten factory visits and engineering conversations, but a Texas address does not prove that a vendor can commission or repair equipment at every campus. Ask for named field staff, spare holdings, and response terms. Power is the first gating item.
The Electric Reliability Council of Texas now applies a formal study process to large loads, with added modeling for electronic loads such as data centers. A project should not present a utility request as secured power. Buyers and developers need the interconnection study, transmission service provider milestones, commissioning plan, and operating limits.
The thermal design must then survive hot summer hours. Dry coolers avoid water but lose capacity as ambient temperature rises. Evaporative or hybrid systems protect peak capacity but consume water and require treatment.
A warm direct-to-chip or immersion loop improves both choices by raising the allowable rejection temperature. It does not eliminate the need to model the design day, fan and pump energy, backup cooling, and local water availability. The strongest tracked market evidence is operating immersion.
The Texas Advanced Computing Center has a named 280 kilowatt Lonestar6 installation, and GRC reports 1.2 megawatts of Shell compute at Skybox Houston One. Both records come largely from the supplier, so their energy figures should remain qualified. For a site decision, compare grid milestones, summer dry- and wet-bulb duty, annual and drought water, local service, fluid logistics, and equipment lead time.
Texas is attractive for cooling supply and deployment experience. It is not a place to use annual weather or corporate headquarters as a substitute for project engineering.
Local manufacturing and engineering are growing alongside the AI campuses. Treat any free-cooling or dry-cooler claim with care until it has been checked against a Texas summer.
Connected records
Companies connected to this market
LiquidStack
Makes both kinds of liquid cooling: the distribution equipment for cold plates, and tanks for immersion.
GRC
One of the longest-established immersion cooling companies, supplying the tanks, the fluid, and the controls together.
Accelsius
Two-phase cold-plate cooling, sold as rack and multi-rack systems under the NeuCool name.
Midas Immersion Cooling
An immersion cooling supplier working across data centers, research computing, and digital asset mining.
Dell Technologies
Ships factory-integrated PowerEdge racks with PowerCool cold plates, manifolds, distribution units, and rear-door options.
HPE
A supercomputing supplier with the longest record of shipping liquid-cooled machines at scale.
Connected records
Tracked projects and contracts
TACC Lonestar6 immersion cooling
The Texas Advanced Computing Center uses GRC ICEraQ Series 10 immersion systems for part of its Lonestar6 supercomputer.
Shell Skybox Houston immersion cluster
Shell runs a 1.2 MW Penguin Solutions high-performance computing cluster in GRC immersion tanks at the Skybox Houston One facility.
Evidence ledger
Sources and evidence
The links below show where the factual claims came from. Supplier specifications remain supplier-reported unless the record names independent operating evidence.
- 01DataCenterChill deployment and company index
DataCenterChill
- 02Questions and answers about the Large Load Interconnection Process
Electric Reliability Council of Texas · Dec 24, 2025
- 03GRC cools Lonestar6 supercomputer
GRC · Jan 31, 2022
Record information
- Record ID
- DCC / DATA / TEXAS
- Record reviewed
- Aug. 9, 2026
- Newest source published
- Dec. 24, 2025
- Record first published
- Aug. 9, 2026
- External sources
- 2
- Search visibility
- Offered to search engines
Decision support