Open data

Verified liquid-cooling deployment tracker

Liquid-cooling projects with a named operator, a location, a stage, and at least one source — separating what is operating from what was announced.

Rows
9
Columns
13
Version
2026-08-09
Generated
2026-09-24T05:08:37.204Z
Identifier
dcc:liquid-cooling-deployments
Licence
CC BY 4.0
Download CSVDownload JSON

9 rows. Verified liquid-cooling deployment tracker carries its methodology and limits inside the JSON file, so the file can be read without this page.

What you can answer with it

  • Count operating capacity without counting announcements twice.
  • See which architectures have moved past pilot in a given market.
  • Find the projects a supplier can actually point to, and the ones it cannot.

How the rows were built

  1. Rows are the deployment records on this site. Each carries a stage taken from the most recent source, and the stage history is on the record.
  2. Stage is deliberately four values — operating, deploying, planned, pilot — because a finer scale would imply knowledge the sources do not contain.
  3. Capacity is quoted as the source states it. Where a project reports IT load and facility load differently, the record says which.
  4. A project with no source is not published, so it is not in this file.

The full editorial standard, including how sources are ranked and how project stages are labelled, is on the methodology page.

What it does not cover

  • Operators disclose selectively. A market with few rows may be under-reported rather than under-built.
  • Announced capacity frequently changes and is rarely restated publicly. Treat a figure as of its review date, not as current.
  • Supplier attribution is limited to what a source names, so a project may involve suppliers this file does not list.
  • Colocation projects are recorded at the facility, not per tenant, because tenant loads are almost never public.

PreviewFirst 9 of 9 rows

ProjectOperatorLocationStageAnnouncedCapacityRack densityComputeArchitectureNamed suppliersSourcesReviewedRecord
DarkNX Ontario AI campusDarkNXOntario, CanadaPlannedNov. 17, 2025300 MW planned; first phase two × 65 MWNot disclosedAI and high-density GPU workloadsTwo-phase direct-to-chip coolingAccelsius; Johnson Controls1Aug. 9, 2026Open record
Madhya Pradesh–Submer AI capacity programGovernment of Madhya Pradesh and SubmerMadhya Pradesh, IndiaPlannedJuly 28, 2025Up to 1 GW under a memorandum of understandingNot disclosedAI-ready data centersDirect-to-chip liquid cooling; Single-phase immersion cooling; Hybrid air and liquid coolingSubmer1Aug. 9, 2026Open record
Equinix Ashburn NeuCool deploymentEquinixAshburn, Virginia, United StatesOperatingJuly 15, 2025IR80 demonstration systemNot disclosedCo-innovation and customer validationTwo-phase direct-to-chip coolingAccelsius1Aug. 9, 2026Open record
SoftBank–Foxconn H200 rack cooling pilotSoftBankJapanPilotMay 21, 2025One rack-scale demonstrationNot disclosedNVIDIA H200 GPUsTwo-phase direct-to-chip coolingZutaCore1Aug. 9, 2026Open record
Stellium OCP immersion proof of conceptStellium Data CentresNewcastle, United KingdomPilotApril 1, 2025Proof of conceptNot disclosedMitac Open Rack v3 servers with AMD CPUsSingle-phase immersion coolingSubmer1Aug. 9, 2026Open record
Submer Barcelona AI data centerSubmerBarcelona, SpainPlannedFeb. 28, 202556 MW150 kW+ per rack or tank (design target)AI infrastructureDirect-to-chip liquid cooling; Single-phase immersion cooling; Hybrid air and liquid coolingSubmer1Aug. 9, 2026Open record
LiquidStack 300 MW U.S. multi-site orderUndisclosed U.S. data-center operatorMultiple sites, United StatesDeployingJan. 6, 2025300 MW aggregate CDU capacityNot disclosedAI-ready, high-density infrastructureDirect-to-chip liquid cooling; Hybrid air and liquid coolingLiquidStack1Aug. 9, 2026Open record
Shell Skybox Houston immersion clusterShellKaty, Texas, United StatesOperatingJan. 1, 20241.2 MWUp to 100 kW per 42U rack with warm water, company reportedPenguin Solutions high-performance computing cluster with AMD processorsSingle-phase immersion coolingGRC1Aug. 9, 2026Open record
TACC Lonestar6 immersion coolingTexas Advanced Computing CenterAustin, Texas, United StatesOperatingJan. 31, 2022280 kW immersed systemNot disclosedDell C6525 servers with AMD EPYC CPUsSingle-phase immersion coolingGRC; Dell Technologies1Aug. 9, 2026Open record

Data dictionary13 columns

projectProject
Project or site name as the sources give it.
operatorOperator
The party running the facility, not the tenant.
locationLocation
Stated to the granularity the source supports.
stageStage
Where the project is: announced, planned, pilot, deploying, or operating. Stage is not evidence strength.
announcedAnnounced
Date of the earliest public announcement on file.
capacityCapacity
As stated by the source; IT load and facility load are distinguished on the record.
densityRack density
Per-rack power as published, where published.
computeCompute
Accelerator or server platform named by the source.
architectureArchitecture
Cooling architectures in use, from the record's links.
suppliersNamed suppliers
Only suppliers a source names. Absence is not evidence of non-involvement.
sourcesSources
Count of cited sources on the underlying record.
reviewedReviewed
When a human last read the record this row came from.
recordRecord
Canonical URL of the record, so every row is traceable.

Versions and change log

This file is 2026-08-09, generated 2026-09-24T05:08:37.204Z from 9 records. No publish has changed this file since versions started being recorded, so the version quotes the most recent review across those records instead. The rows themselves are always regenerated from the records, so a correction reaches the file as soon as it reaches the record.

No published change has touched a record in this file yet. When one does, it appears here rather than only in the file.

Formats and licence

Licensed CC BY 4.0: Free to use, republish, and build on, including commercially, with attribution to DataCenterChill and a link to the dataset page. Read the licence.

Citing and correcting

Cite it as: DataCenterChill, Verified liquid-cooling deployment tracker (dcc:liquid-cooling-deployments), 2026-08-09, https://www.datacenterchill.com/datasets/liquid-cooling-deployments. Quoting a figure without the conditions in its row is the error this file exists to prevent, so keep them together.

A row that is wrong is a record that is wrong. Send the source and the correction reaches the record, this file, and every page connected to it.